GK Processing has been involved in projects concerning renewable energy form the very beginning. Currently, the company is cooperating with the oldest and the biggest geothermal enterprise in Poland, Geotermia Podhalańska. The corporation was established in the 1998 and since then it has been developing steadily. Presently the company is engaged in a quite challenging project Bańska PGP-4. It is planned to drill the 5 kilometres deep well which will be the deepest one in Poland. The water in the well is expected to be about 130 degree Celsius hot which can be sufficient to establish the first geothermal power plant in Poland. The project is supported by the NFOŚiGW with 45 million PLN. Part of the money will be spent on seismic researches. In order to facilitate the project GK Processing has been doing the 3D reprocessing which will provide very vital information allowing to specify the optimal location of the well. The survey has already been successfully completed. In the next step the fractures will be recognised with the help of the high definition anisotropy maps which currently have been the topic of research done by GK Processing R&D team.